Waste Management (Initial Pics)



















These are pictures of the waste management measures we set up at the site after deconstruction was completed (this area was used to store salvaged materials during deconstruction). In the construction phase, we are going for LEED points associated with minimal waste production (allowing a maximum of 2.5 lbs of landfill-bound waste per square foot of interior space). To help mee this credit, we established these recycling areas for clean wood and metal. We also set up areas for cardboard and recyclable plastic containers. Since these original pictures were taken, we've made some small changes in order to expand the clean wood recycling pile, and to improve the signage... more pics on that later...