The pictures that follow were taken towards the end of October. After the structural and framing work was completed, and before the drwall went in, the rough electrical and plumbing work had to happen. The electrical work included wiring all lights and outlets, appliance locations, and smoke and carbon monoxide detectors. By this point in the project, major design decisions - for example, kitchen and bathroom layouts - had to be finalized in order to move forward.
Downstairs Front Bedroom |
Recessed Can Housing |
Dining Room |
Kitchen: Wiring for Pendant Lights (to hang from collar ties) |
Kitchen |
Family Room with Recessed Can Lights |
Downstairs Bathroom Vent and Shower Light |
Plumbing in Basement |