Monday, March 5, 2012

Finish Work in Progress.... Pictures from Late January

Living Room trim and doors:


Kitchen cabinets and countertop, dining room:











Staircase window and Master Bedroom doorway trim:




Family Room:


Downstairs Bathroom door and trim:


Downstairs bathroom window trim and tile:




Downstairs back bedroom:





Refinished clawfoot tub (for Master Bath):


Refinished clawfoot tub feet:








Master Bath shower:





City Water Department turning the water off (so that a leaking valve could be replaced):


Front door window:


Refinished floor in downstairs front bedroom:






Master Bedroom:
















Downstairs Bathroom linen cabinet in progress:


Master Bath vanity (in progress / before refinishing):

No comments:

Post a Comment